Blog

First assistant director reviewing an advance rigging call schedule on a tablet while grips assemble an overhead lighting truss on a soundstage.

How to Schedule and Document Advance Rigging Crews on a Film Call Sheet

Discover how assistant directors and production coordinators schedule advance rigging teams, format pre-rig calls, and manage leapfrog locations on a daily film call sheet. Learn clean notation for power drops, lighting pre-rigs, truck dispatch, and digital crew confirmations.

When a production tackles intricate lighting setups or consecutive location moves, waiting for the main shooting unit to wrap before striking and rebuilding equipment guarantees crippling overtime. Assistant directors solve this bottleneck by deploying an advance rigging crew. Whether it is an electrical team pre-stringing feeder cable at tomorrow's interior stage or a leapfrog grip crew rigging overhead speedrail at an afternoon exterior, staging support ahead of the main unit keeps cameras rolling. Documenting staggered call times, separate staging addresses, and dedicated department channels on your daily call sheet ensures your prep team executes smoothly without disrupting on-set rhythm.

What Is an Advance Rigging Crew on a Film Set?

An advance rigging crew is an early or secondary team of technicians, typically grips, electrics, and rigging gaffers, dispatched ahead of the main filming unit. Instead of following the main company call, this group reports hours early or operates entirely at an upcoming location. Their mission is practical: fly pipe grids, drop distribution boxes, pre-light heavy night exteriors, or build complex camera rigging so the shooting crew can step in and shoot immediately upon arrival.

How to Format Advance Calls and Leapfrog Crews on a Call Sheet

Never bury an advance crew inside the standard department roster without distinct labels. When an advance team member glances at a sheet, they must immediately recognize their specialized call time, address, and supervisor. Follow these formatting principles to eliminate set-day confusion:

  • Designate an Advance Rigging Subheading: Under the Grip and Electric department blocks, create clear line items labeled Rigging Electric or Advance Grip Pre-Rig rather than lumping them with the shooting set keys.
  • Specify Secondary Location Details: If the advance crew is staging at a second location while the main unit shoots scene one, state the exact secondary address, parking notes, and entry gate directly adjacent to their call times.
  • Clarify Department Reporting Lines: Note the on-site Rigging Gaffer or Key Rigging Grip and list their walkie-talkie channel, often separated from the main production channel to avoid chatter.
  • Document Power and Facility Handoff Times: Detail generator drop-off windows, facility lockbox codes, and the targeted handoff time when the set must be ready for the 1st AD.

Handling multi-location notes and customized schedules in static spreadsheets often leads to formatting errors. With Easy Call Sheets, production teams build clear, professional call sheets in under two minutes. You can set individual call times for each technician, insert distinct department notes, and attach rigging maps directly to the call sheet link.

Managing Safety Protocols and Radio Channels for Pre-Rig Crews

Because advance teams often operate in empty warehouses, remote alleys, or active soundstages without full medical staff present, production coordinators must specify core safety contingencies:

  • Emergency Contact and Designated Medic: Clearly list whether set medics are assigned to the advance stage or provide contact numbers for local urgent medical facilities near the pre-rig venue.
  • Direct Walkie Channels: Assign a dedicated sub-channel for rigging conversations so overhead truss adjustments and power tie-in tests do not interrupt shooting dialogue on Channel 1.
  • Load-In Truck Gates: State precise truck dock assignments, gate codes, and clearance heights so heavy grip trucks do not block neighborhood streets or passenger basecamp.

Eliminating Confirmation Anxiety with Digital Distribution

Advance rigging teams often report to work early or overnight. When you send call sheets through email attachments or clumsy spreadsheets, you are left wondering whether crew members saw schedule changes. By switching to Easy Call Sheets, technicians receive an instant SMS and mobile-friendly email containing their individual call time and GPS pin. Crew members confirm attendance with a single tap, giving coordinators real-time dashboard visibility without late-night texting. Try the free plan for your next shoot or upgrade to Pro at $29/month for unlimited crew notifications.